Choosing the right kitchen fixtures and finishes is an exciting part of any kitchen remodel or new construction project. With so many options to consider, from faucets and lighting to cabinets and countertops, it can be overwhelming to know when to make these key design decisions. Here is a helpful guide on the optimal timing for picking kitchen fixtures, appliances, and finishes to ensure your new kitchen is beautifully coordinated and fully functional.
Introduction
The kitchen is often considered the heart of the home, so it makes sense that kitchen remodels are one of the most popular home improvement projects. When undergoing a kitchen remodel or building a new home, one of the most important steps is selecting the fixtures, appliances, and finishes that will define the look and function of the space.
The key kitchen elements that require careful selection and coordination include:
- Faucets and sinks
- Lighting fixtures
- Cabinetry
- Countertops
- Backsplashes
- Appliances
- Flooring
With so many options for styles, materials, colors and configurations, it can be overwhelming to know when to make these major design decisions. Proper timing is crucial for avoiding delays, cost overruns and coordination issues.
This guide will walk through the optimal timeline for picking kitchen fixtures and finishes to ensure your kitchen remodel goes smoothly. Following the proper sequence and schedule will result in a cohesive, well-designed and properly functioning kitchen.
When to Select Faucets and Sinks
The kitchen faucet is one of the most frequently used features, so its placement, style and function should be determined early in the design process. Sink selection is also a high priority, as the sink and faucet work in tandem.
Recommended timeline: Select sinks and faucets approximately 8-10 weeks prior to the anticipated start of cabinetry installation.
This allows sufficient time for any custom faucet or sink orders to be processed and delivered. It also enables the plumbing rough-in work to be completed according to the dimensions and configuration of your chosen sinks.
Key considerations when selecting sinks and faucets:
- Number of sinks/basins
- Configuration – single bowl, double bowl, farmhouse apron front, etc.
- Mounting style – undermount, top mount, apron front
- Depth
- Materials – enameled cast iron, stainless steel, composite, natural stone, etc.
- Faucet hole configuration
- Faucet features – sprayer, pull-down/pull-out, touchless, soap dispenser, filtration, etc.
- Faucet finish – polished chrome, stainless steel, matte black, brushed nickel, oil rubbed bronze, etc.
- Faucet placement – center, side, or wall-mount; distance between handles and backsplash/wall
Allowing adequate lead time prevents delays should any special order items run into shipping or manufacturing issues. It also allows for returns if you decide to change a selection after seeing the items in person.
When to Select Kitchen Lighting
Lighting is a crucial kitchen design element that impacts the entire aesthetic, sets the mood, and enables safe cooking and food prep.
Recommended Timeline: Make final lighting selections 6-8 weeks prior to cabinet installation.
This timing ensures any custom light fixtures will arrive in time and that electrical plans include all required wiring, switches and dimmers. Key lighting decisions include:
- Main ceiling lights – flush mount, semi-flush, pendant or chandelier over sink or island
- Task lighting – under cabinet, track lighting, recessed
- Decorative accent lighting – glass pendants, track heads, recessed strips
- Natural light – skylights, windows over sink, other solar tubes/light wells
Builders or kitchen designers will need precise placement for can lights, dimmer switches, and any required electrical boxes based on your lighting plan. Leaving lighting until the end can severely limit options and may require tearing into newly finished walls or ceilings.
When to Select Kitchen Cabinets
Arguably the most important decision, cabinetry defines storage, workflow, style and visual appeal of the entire kitchen.
Recommended Timeline: Finalize cabinet design and order 6-8 weeks before start of demolition/renovation.
This allows the lead time for custom cabinets to be manufactured and delivered on schedule. For stock cabinetry, 6-8 weeks provides a buffer in case certain cabinets are backordered. Key cabinetry considerations:
- Style – shaker, traditional, contemporary, flat panel, etc.
- Door material – wood, painted, thermofoil, glass, metal
- Finish – stain, paint, glaze, distressing
- Hardware style and finish
- Island, pantry and appliance garage details
- Organizational inserts and accessories – drawers, trays, pull-outs
- Crown molding, trim, accents
- Toe kick finish
Work closely with kitchen designers to optimize cabinet layout, include all needed accessories, and coordinate with appliances. Leaving cabinetry until the last minute can severely limit options, slow the renovation timeline, and may result in a kitchen layout that falls short of storage or usability needs.
When to Select Countertops
Countertops are a focal point of any kitchen, heavily used for food prep and dining. The materials significantly impact the room’s decorative style.
Recommended Timeline: Finalize countertop selections 4-6 weeks prior to fabrication.
Countertop suppliers or fabricators require several weeks lead time to source slabs, make digital templates, and fabricate and install the counters. Materials like quartz, granite, marble, soapstone, and recycled glass require different fabrication methods, so the timelines may vary.
Key countertop considerations:
- Materials – quartz, granite, marble, laminate, butcher block, concrete, stainless steel, etc.
- Edge details – full bullnose, square, eased, ogee, etc.
- Thickness – standard 1 1/4″ up to 2″ for thicker materials
- Backsplash design – materials, height, accent tiles, etc.
- Seams and gathering areas
- Coordination with sinks/faucets – cutouts and overhangs
Visiting the stone/slab yard to choose your material allows you to see all your options. Be sure to select a durable material appropriate for heavily used kitchen surfaces.
When to Select Backsplashes
While smaller in scale than countertops or cabinetry, the backsplash makes a big visual impact in defining the kitchen’s style.
Recommended Timeline: Finalize backsplash selection 2-3 weeks prior to installation.
Typical backsplash materials like ceramic tile, glass tile, and some metals can be purchased and delivered quite quickly. But some special order or handmade tiles may require 4-6 weeks lead time.
Key backsplash considerations:
- Materials – ceramic, glass, metal, stone tiles or panels, mosaics, etc.
- Accent areas – behind range, along open shelves, framing window over sink, etc.
- Pattern and designs
- Grout color if using tile
- Coordinating with countertops – overlap any edging
- Outlets – height and clearance
Be sure to order 10-15% extra tile to account for unusable cuts, breakage, or future repairs. Don’t wait until the end when you’re rushed and left with limited choices.
When to Select Kitchen Appliances
Appliances are centerpieces of kitchen function for refrigeration, cooking, and cleaning. Their placement in the cabinet layout significantly impacts workflow.
Recommended Timeline: Order appliances 8-10 weeks prior to cabinet installation.
This accounts for potential shipping or supply issues on certain models. If cabinets are delayed, you can store appliances safely until needed. Key appliance considerations:
- Refrigerator – size, configuration, counter depth vs standard, custom panels to match cabinets
- Range – slide-in or freestanding, fuel type, oven configurations, convection
- Cooktop – induction, gas, electric, downdraft venting
- Wall oven and microwave – single or double oven, combination oven/microwave
- Dishwasher – size, tub material, cycles, food disposal unit
- Wine refrigerator, beverage centers, other specialty appliances
Coordinate appliance selections with your designer to ensure proper cabinet sizes, electrical supply, and plumbing. Leave time for returns/exchanges in case appliances are damaged or the wrong items are delivered.
When to Select Kitchen Flooring
The flooring unifies the entire kitchen space. Materials must be durable and water-resistant.
Recommended Timeline: Buy flooring 2-3 weeks before installation.
Many flooring materials only require 2-3 weeks lead time for delivery. But some wood planks or natural stone tiles may take 4-6 weeks for special orders.
Key flooring considerations:
- Durability for heavy appliance traffic and potential water/spills
- Material – ceramic/porcelain tile, luxury vinyl plank, hardwood, concrete, etc.
- Style – plank sizes and lengths, tile shapes and patterns
- Color/stain that complements cabinets, counters, and backsplashes.
Water-resistant luxury vinyl plank flooring is an excellent choice for kitchens. Schedule flooring delivery just before the installation date to avoid damaging boxes of planks or tiles. Ensure the flooring works with the kitchen layout including appliance and cabinet placement.
Conclusion
The optimal timeline for picking kitchen fixtures, finishes, and appliances is:
- 8-10 weeks before start – order sinks, faucets, appliances
- 6-8 weeks before start – lighting fixtures and cabinetry
- 4-6 weeks before start – countertops
- 2-3 weeks before start – backsplash tile, flooring
Following this sequence allows sufficient time for any custom orders, prevents delays, and ensures all the elements coordinate beautifully. It prevents having to make last-minute, rushed decisions that could compromise the design or functionality of your new dream kitchen.
With some advance planning and coordination with your contractor, designer and suppliers, you can create a smooth process for designing and building your ideal kitchen. Carefully chosen fixtures, an organized layout, and well-integrated finishes will result in a cohesive, gorgeous and highly functional kitchen you can enjoy for years to come.
Frequently Asked Questions About Picking Kitchen Fixtures and Finishes
Picking fixtures, appliances and finishes for a kitchen remodel involves many decisions. Here are answers to some frequently asked questions about choosing these important kitchen elements at the right time.
What if I need to order appliances before finalizing my kitchen design?
If you see a good sale on appliances, you can order key pieces like the refrigerator or range early, but be sure you can store them until needed. Leave some flexibility in the layout so cabinets can be adjusted around appliance sizes.
When should I select my kitchen cabinet hardware?
Choose cabinet knobs or pulls around the same time as the cabinets, 6-8 weeks before installation. This allows the hardware to be installed on the doors and drawers at the manufacturer rather than onsite.
How soon do I need to pick my kitchen faucet style?
Select your kitchen faucet 8-10 weeks prior so the plumbing can be roughed-in properly to accommodate the faucet placement and sink drain.
Can I wait until the end to pick backsplash tile?
While possible, choosing the backsplash early ensures it coordinates with countertops. Rush orders could limit tile availability. Order extra tile during initial purchase.
What if my countertop fabricator doesn’t need 4 weeks lead time?
That timeline allows for potential delay if counters need to be remade due to sizing issues or damage during fabrication. Build in some buffer in case there are issues.
Can I install my own kitchen backsplash?
Yes, a diy backsplash is achievable. Be sure to properly prepare the surface and use quality materials. Take extra care with grouting and cuts for a professional finish.
When should I order customized items like window coverings?
Order any custom window treatments, draperies or blinds 8-10 weeks before your target installation date. These custom items can take longer than cabinets or counters to manufacture.
What if I’m still undecided on a backsplash style?
Take tile samples home or browse an online gallery to help decide. Contrasting grout colors can dramatically change the look. Neutral backsplashes offer flexibility.
How do I coordinate cabinet stain or paint with countertops?
Bring material samples home and view under normal lighting at different times of day. Neutral whites and grays provide the easiest coordination.
What kitchen flooring works best with pets or young children?
Durable water-resistant vinyl plank flooring or porcelain tile can withstand messes while providing comfort underfoot.
Picking kitchen finishes is exciting, but proper timing ensures your selections integrate beautifully. With some advance planning, you can confidently tackle one of the most important rooms in home.
Factors that Impact the Cost of a Kitchen Remodel
Kitchen remodels can range from simple cosmetic updates to full gut renovations. Numerous factors influence the overall budget for transforming this important space. Understanding these cost drivers helps set realistic expectations.
Key Factors that Impact Overall Remodel Cost
Size of the space – Larger kitchens require more materials and labor hours, increasing overall cost. Island additions also boost budgets.
Scope of work – Limited upgrades vs. taking space down to the studs for a complete custom overhaul.
Choice of finishes/materials – Budget-friendly laminates vs. luxury natural stone, handmade tile, and exotic wood species.
Appliance upgrades – Standard models vs. professional-grade or commercial appliances.
New layout/reconfiguration – Moving walls, plumbing, electrical significantly increases labor time and complexity.
Permits – Requirements vary regionally. Permits, inspections and any architectural drawings add expenses.
Location and contractors – Labor rates fluctuate based on region, market demand, and contractor overhead and margins.
Unforeseen issues – Problems behind walls or under floors that don’t appear until demolition begins.
Cost Breakdown by Element
Cabinetry – 20-40% of total budget. Primary cost driver.
Countertops – 10-15% of budget. Materials and fabrication/installation costs.
Sinks and faucets – 5-10% of budget. More for luxury brands or custom sinks.
Lighting – 3-5% of budget. Costs multiply with multiple fixtures.
Flooring – 3-7% of budget. Durable resilient materials are most affordable.
Backsplashes – 2-5% of budget. Handmade tiles can push costs upward.
Paint/finishes – 2-4% of budget. More for special finishes.
Demolition/disposal – 2-5% of budget. Higher for full gutting.
Appliances – 5-15% of budget. Costs climb for premium brands and models.
Other – Ventilation, electrical, new windows. Can be 10-15% of budget or more if extensive work needed.
Average Costs
Here are typical average costs, although prices vary broadly by market:
- Minor update – $15,000 – $30,000
- Major remodel – $60,000 – $150,000
- Luxury custom – $150,000+
Key Takeaways
- The most significant driver of kitchen remodel cost is the scope of work. The more extensive the changes, the higher the budget.
- Allow contingencies for surprises, especially in older homes that may conceal problems.
- Get quotes from several contractors to compare pricing.
- Set a realistic budget before designing your dream kitchen. Prioritize the elements that matter most.
With proper planning and budgeting, you can transform your kitchen for years of beauty and enjoyment within your goals. Use this cost overview to set expectations and budget wisely.
When to Fix Up the Kitchen During Home Upgrades
Many homeowners undertake renovations to increase enjoyment of their living space. The kitchen is often a primary target for remodeling projects, but deciding on proper timing is key. Here is when a kitchen upgrade makes the most sense when improving your home.
Prior to Listing a House for Sale
One of the best returns on investment comes from remodeling an outdated kitchen right before listing your home. This appeals to buyers, as the renovated kitchen helps sell the house faster and increases the home’s value.
Aim to complete the kitchen makeover 60-90 days before listing day. This provides enough time to finish the renovation, including any unexpected delays. It also allows you to live in the improved space to test workflow and make any revisions.
Focus the updates on features buyers notice:
- Cabinet face frames, doors and hardware
- Sink and faucet
- Fresh paint colors
- New counters and backsplash
- Lighting and plumbing fixtures
- Hardwood floor refinishing
Avoid custom details unlikely to suit a buyer’s taste. Stick to neutral backsplash materials like subway tile. Save ultra-luxury appliances for your forever home kitchen.
After Moving In to a New House
For a newly purchased home, live in the existing kitchen for 6-12 months before undertaking renovations. Get a feel for how you use the space and identify needed changes. This also allows you to save up funds after closing costs and furnishings.
Temporary cosmetic updates like paint and new cabinet hardware can refresh the space inexpensively until you’re ready for larger upgrades. Dated laminate counters and backsplash or worn cabinets are likely candidates for eventual replacement or resurfacing.
When the Current Kitchen Is Failing Functionally
As your household expands or contracts over the years, assess if the current kitchen layout still functions efficiently. Children require accessible low cabinets. Empty nesters may desire less upper storage and more rollouts.
Likewise, if appliances are failing or you need better lighting and surfaces for aging eyes and hands, a full remodel can renew the space. Remodel to suit your current work patterns and needs.
To Accommodate Lifestyle Changes
Has your cooking approach changed? Do you need a larger refrigerator and chef-quality range to accommodate more home cooking? Or perhaps you mainly use the microwave and order in, calling for a streamlined galley